soi cầu xsmb vip(www.84vng.com):Change in govt administration will not derail RTS project: MRT Corp

皇冠足球投注平台www.hg9988.vip)是皇冠体育官方投注平台,开放皇冠信用网代理申请、信用网会员开户,线上投注的官方平台。

MRT Corp chief executive officer Datuk Mohd Zarif Hashim

ISKANDAR PUTERI: The new government administration will not affect the course of the Johor Bahru-Singapore Rapid Transit System (RTS) Link project, said Mass Rapid Transit Corp (MRT Corp).

Chief executive officer Datuk Mohd Zarif Hashim said the project that received approval from the Cabinet in 2019 was a government commitment that needed to be implemented.

"The first Cabinet approval (for the project) was given in 2019. In 2020, there were further discussions in the Cabinet.

"This project is a commitment from the government, as a country, we have to do it. The project is also halfway through with all the land already purchased,” he told reporters after the RTS and Impact on Johor Seminar at the University of Reading Malaysia, here, today.

Asked if the frequent flash floods in the city would delay the progress of the project, Mohd Zarif said it should not interfere because the project site is on high ground.

Regarding the development of RTS, he said the project has so far reached more than 20 per cent and is running according to schedule, including the construction of the depot located in Wadi Hana, here.

"Now it is being built (depot), including peeling and foundation. From there, we will raise the building,” he said.

,

soi cầu xsmb vip(www.84vng.com):soi cầu xsmb vip(www.84vng.com) cổng Chơi tài xỉu uy tín nhất việt nam。soi cầu xsmb vip(www.84vng.com)game tài Xỉu soi cầu xsmb vip online công bằng nhất,soi cầu xsmb vip(www.84vng.com)cổng game không thể dự đoán can thiệp,mở thưởng bằng blockchain ,đảm bảo kết quả công bằng.

,

Mohd Zarif said the RTS project, which can reduce traffic congestion and shorten the journey by about 15 minutes from Johor Bahru to Singapore, is expected to bring economic spillover and investment to Johor.

"What is most important is that we want to encourage investment in terms of goods and services, thus encouraging foreign direct investment (FDI) into Johor.

"It will also attract approximately 1,500 construction job opportunities, but the overall impact in terms of supporting industries, hotels, logistics and food we are expecting the creation of about 30,000 jobs,” he said.

The RTS project is expected to be completed in December 2026 and fully operational on Jan 1, 2027.

MRT Corp is the developer and owner of the civil infrastructure for the Malaysian section of the rail project. - Bernama


转载说明:本文转载自Sunbet。,

博彩平台推荐www.99cx.vip)是一个开放皇冠体育网址代理APP下载、皇冠体育网址会员APP下载、皇冠体育网址线路APP下载、皇冠体育网址登录APP下载的官方平台。博彩平台推荐上最新博彩平台推荐登录线路、博彩平台推荐代理网址更新最快。博彩平台推荐开放皇冠官方会员注册、皇冠官方代理开户等业务。

添加回复:

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。